Power Systems Software Tutorials

Our electrical engineering software is easy to use yet powerful and rich with features.

We provide these video and step-by-step tutorials to help our users to get the most out of the software.

Sign up and receive the latest tutorials as they are released.

Choose your software product

4 mins read
This video teaches the fundamentals of soil dry out and explains how it affects power cable ampacity calculations. Several example calculations are explained.
2 mins read
Team accounts provide multiple licences for the staff members of companies, where each user has their own licences managed under one account.
5 mins read
This tutorial shows how to use the Fault Current Distribution module in ELEK SafeGrid Earthing Software to model an earth fault on an overhead transmission line with an underground cable link.
3 mins read
The Transient Rating module in ELEK Cable HV Software calculates the emergency and cyclic current rating of cables installed in air and buried cables, in accordance with IEC standards.
How to use the Cable Model Editor to model custom cables from manufacturer datasheets and use the cable model obtain the current-carrying capacity.
Provides a worked example of a cable pulling tension calculation where the input cable sections and the tension and sidewall pressure results are explained.
2 mins read
A cable schedule is a summary list of cables within a project or electrical installation This tutorial shows how to generate a cable schedule report from (1) the cable sizing calculations in a project; and (2) from all the cables in and electrical network calculation.
4 mins read
With the Fall of Potential Test, the resistance of an earthing system is measured using a remote earth electrode. There is a theoretical position of 61.8 % of the separation distance between the measured grid and the remote electrode, which is the correct position for measuring the exact grid impedance for uniform soil resistivity but not for multilayer soils. This tutorial shows ELEK SafeGrid Earthing Software users how to simulate an FOP test.
This tutorial explains how to use the arc flash calculator in Cable Pro Web software that includes incident energy and arc flash boundary calculations for both AC and DC faults to IEEE 1584-2018, ENA NENS, DGUV 203-077, Stokes method, and more. PPE categories from NFPA 70E-2024 are included. Arc flash labels can be generated.